What moves a roofing quote, without any prices
Cost factors for a roof job near Lyndhurst, in plain order
No price list here. These are the things that make one roofing job larger or smaller than another, each tied to a page that says something about it, so a quote can be read item by item.

Roof area and the joints on it
The size of the roof is the first factor and the number of joints is the second. The Building America Solution Center says every roof-wall intersection needs flashing, so every dormer, chimney and porch roof adds metal and labor to a job.
Photographs of each slope, with a count of dormers and chimneys, let a roofer talk about the job before the first visit.
What sits under the shingles
FEMA's shingle fact sheet calls for underlayment every time, roofing nails in place of staples, and six nails in each shingle along the eaves. The Energy Department's roof brief says roof-deck wood needs a moisture content below 20 percent before it is covered.
A roofer may not know the state of the deck until old roofing comes off, so ask how a damaged board would be handled and recorded.
Flat sections and their drains
Low-slope parts of a roof have their own line. For the asphalt roofing trade group, ponding means water that sits for 48 hours or longer; it recommends a quarter inch of slope per foot and lists deck flexing, ice damage and clogged drains among the effects.
A flat section that ponds may call for drainage work that a shingle section never needs, and a quote can list it as its own item.
Hauling away the old roof
Secaucus public works says bulk pickup takes small home-improvement debris but not contractor materials, and its Construction Department lists a dumpster permit form. Lyndhurst's public works page lists weekly curbside pickup of recyclables and, by appointment on Fridays, pickup of appliances, electronics and metal.
The quote can state who orders the dumpster, where it stands and who pays any town fee.
Fees charged by the town
Lyndhurst's fee schedule lists a nonstructural re-roof at $75 for a one- or two-family home. Nutley's department page says the permit process and fees are explained by staff by phone or in person, and Secaucus's page lists no fees. A quote can say whether fees are included or billed at cost.
On ordinary maintenance, the state's list names roofing on detached one- and two-family houses.
When an insurance claim is involved
The state insurance department tells claimants to document damage, make temporary repairs, keep receipts and call the insurer early, and says nobody has to use the insurer's recommended contractor. The Energy Department's brief adds that before any repair on a claim, the agent is worth a call.
Coverage questions stay with the insurer; the roofer can supply photographs and a written scope.
Checked 1 Nov 2026